Before boilers can be placed in operation, what must be completed?

  1. Repaired and painted

  2. Inspected and tested

  3. Calibrated and approved

  4. Connected and authorized

The correct answer is: Inspected and tested

For a boiler to be placed in operation, it is essential that it is inspected and tested. This process ensures that the boiler is safe for use and operates efficiently within the required safety standards and regulations. The inspection checks for structural integrity, proper installation, and adherence to design specifications, while testing evaluates the functionality of controls, safety features, and overall performance of the boiler system. This requirement is crucial in preventing potential hazards, such as leaks, pressure failures, or other malfunctions that could pose safety risks to personnel and property. It is a standard practice in the industry to perform these inspections and tests prior to the boiler being commissioned for regular operation, as they are foundational steps in maintaining operational safety and compliance with legal and safety regulations. While other options, like repair, calibration, and connection, are important aspects of boiler maintenance and operation, they do not encompass the primary requirement of ensuring the boiler meets safety and functional standards before being placed in operation.